RK3588 EDGE VIDEO EVENT ENGINE
Validate one workflow before scaling the deployment.
A Scoped Pilot evaluates product integration; it is not a public consultancy package. Use representative input to establish whether the required event can be produced, then agree engineering work, licensing and acceptance.
Agree four boundaries first
One business workflow; a specified board/OS/model version; authorized representative input; inspectable outputs and acceptance criteria. Agree camera count, codecs, duration and whether live linkage is included instead of assuming a universal delivery specification.
What to bring
Tell Hank whether you make devices, integrate systems or operate sites; describe hardware/OS, RTSP/MP4 input, target events, receiving platform and difficult cases such as occlusion, night scenes and stream loss. Start with an anonymized description; do not send original customer footage, credentials, keys or licenses.
What a pilot should leave behind
A versioned environment inventory, event definitions, rule parameters, positive/negative results, false positives/misses/duplicates, evidence and interface checks, and a passed/failed/untested list. Keep targets separate from measurements; a short smoke test does not establish sustained reliability.
CONTACT HANK
Prepare a scoped project email
This form only prepares an email draft in your browser. Send it through your email client. The site does not receive or store the form, or claim that a submission was received. Email hank@site-ai-gateway.com.